Customization: | Available |
---|---|
After-sales Service: | Provide Instructions and Online Guidance |
Temperature: | -40 ~ +20 Degree |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Cool Room PU Panel
1.75mm/100mm/120mm/150mm/200mm double side color steel plyurthane panel 2.inside hooks for easy assembling 3.three phase for above 30M3 room 4.sliding door or open door for optional with lock swift 5.environmental friendly R404a refrigerants 6.Dafoss valve 7.All size,temperature,projects customize |
PUR/PIR Panel
Q:How long is the warranty?
A:Warranty is 12 months. However, we will provide timely maintenance suggestions and spare parts support for all the problems that have occurred in the cold storage of our customers these years.
Q:What kind of technical support can you provide?
A:Both our sales and engineers can provide 24 hours online support. Panels are supplied with installation drawings. Installation manuals and electrical diagrams are included with the cooling system. Accessories support is available for all of our products.
Q:Can you send an engineer to the site to install?
A:At present, due to the epidemic, the cost of our engineers going abroad is too high. Returning from abroad requires up to 14 days of quarantine. We recommend that it is more cost effective to find a refrigeration engineer locally. We can provide full online technical support.
Q:Is the condensing unit noisy?
A:We have very quiet options, scroll compressors and rotary inverter compressors are very quiet. It is very suitable for cold storage such as supermarkets and beer houses.
Q:How long is the lead time?
A:Usually for units we need 35 days to produce. If it is a special voltage of 60hz, the production time needs to be extended by 5-10 days. Panels and other things usually we need 7-20 days depends on amount.